Best Practices Manual
Click the YouTube icon below to check out our channel and find videos about our best practices.
You can find our Best Practice Manual Below.
Make sure you Like, Follow, and Subscribe for updates.
Feedback from the Field
Your experience makes us better.
Use this form to share Best Practice Suggestions or general concerns from the field. If you are sharing a concern, leaving your name is optional. If you are submitting a Best Practice Suggestion, please leave your name so we know who to contact!
Earn $5 for each idea submitted — and $50 if it becomes a Best Practice!
Table of Contents
Practices with Videos marked with **
- Administrative
- Message from the President
- Request for Best Practice Review
- Request for Best Practice Review Form
- Equipment
- **Mortar Board Guidelines**
- Hoisting for Others
- Re-Fueling Gas Saw
- Saw Pump Priming
- Winter Wet Saw Enclosure
- Fair Weather Mixing Station Set-Up
- Fair Weather Dual Aggregate Mixing Station
- Foul Weather Mixing Station Set-Up
- Foul Weather Dual Aggregate Mixing Station Set-Up
- Assembly Instructions for Scaffold Access Stair
- Mud Tub Handling
- Slab Edge Access Gate
- Folding a Tarp
- Wrapping an Extension Cord
- Preparation of Equipment
- Laborer Supply Bucket
- Power Washer
- Cleaning Foot Plank
- Rubber Roofing for Covering Material
- 2-Way Radios
- Electric Blanket Storage
- Material
- Chipped Block
- Leftover Materials
- Saw Cut Split Face Unit
- Saw Cut Units at Control Joints/Expansion Joints
- Site Storage of Brick
- Mortar Mixing Procedure
- Masonry Product Patch Kit
- Installation
- **Jointing Backside of Masonry Wall**
- **Inside Corner Jointing**
- Pressure Bar Installation
- Full Head Joints
- **Hollow Metal Frames**
- Hollow Metal Frames – Future Installation
- **Electrical Box Installation**
- Jointing of Regular Block
- Proper Installation of Mineral Wool
- Expansion Joints in Brick Walls
- CJs in Block Walls
- Tooling Split Face Block
- Roof Reglet Receiver Flashing
- RRRF Drawing
- Top of Wall Procedure
- Horizontal Rebar Through Control Joints
- Installation of SS Flashing
- Clean When Green
- Wall Completion
- Base Bed Joints
- Bearing Plate Installation
- Grout Slurry on Walls
- Production Preparation
- Spot-N-Trot
- Keeping Expansion Joints Clean
- **Installing Weep Holes**
- **Spotting a Trig**
- Toothing Out Brick and Block in Existing Walls
- Adjacent Dissimilar Masonry Materials
- Pointing & Patching CMU Walls
- Restoration
