![](https://www.davenportmasonry.com/wp-content/uploads/2018/08/SparrowHospital-1024x613.jpg)
Sparrow Hospital
This project was a 450,000 SF 11-story addition to Sparrow Hospital. We encountered logistical issues as the hospital needed to remain operational, the site was on a busy street, pedestrian and vehicle traffic could not be impeded by scaffolding, and there was no site. To resolve these issues Davenport Masonry engineered a cantilevered scaffolding system that allowed the scaffolding towers to be placed up off the ground so that pedestrian and vehicle traffic could flow normally.